5 Easy steps
1) Setup
Equipment is set up at the job site. Conveniently transported by trailer, AeroBarrier install equipment is mobile and portable. The equipment includes a compressor, generator, blower door, emitters, hoses, and the AeroBarrier machine.
2) Prep
Prep the space. This includes taping or covering any areas that won’t be sealed. Emitters are then set up throughout the area to be sealed.
3) Pressurize
Pressurize the space with the use of a blower door. A computer does the rest, including the control of temperature, pressure, humidity, and distribution of sealant during the process.
4) Seal
See the results in real-time. Throughout the application process, the computer monitor displays the ACH improvement, allowing you full control over your desired level of envelope tightness and the leakage reduction.
5) Certify
Run a final blower door test to verify the sealing results. At the end of the process, receive an AeroBarrier Certificate, with a pre and post leakage report.